Electricity here runs 15.99 cents per kilowatthour
Ohio homes paid that rate in 2024, and a heat pump in Warren runs on electricity every month of the year, not just in summer.
Takes about a minute. No obligation.
Ohio homes paid that rate in 2024, and a heat pump in Warren runs on electricity every month of the year, not just in summer.
A heat pump with a higher rating can cost very differently to run than one that looks similar on paper, so that rating matters as much as the price tag on the install.

NOAA nClimDiv, 1991–2020 normals
HSPF2 and SEER2 are on the label. They show how much heat the system moves for the electricity it uses. That's not the same as how big or powerful it is.
A higher rating means the unit does the same job on less power. So a higher number on the label means a lower bill down the road.




Trumbull County is zone 5A. Heating is the bigger load most of the year, with overnight lows averaging 21°F across December, January and February. That's steady demand, not a big swing that pushes a system to its limits. Size the heat pump right for that load, and it runs at a moderate pace instead of straining to keep up. Easier on the compressor over time. So pick a unit built to hold up. Don't just grab the one with the highest HSPF2 number on the shelf.
Half the homes in Trumbull County were built in 1964 or earlier. That means a lot of houses weren't built with a heat pump in mind. The system going in now has to be sized to the house as it actually is, not to a number on a spec sheet.
Find a contractorA heat pump installed now will likely run for a decade or more against this house, not a newer one. That's why a load calculation on the house as it stands, its windows, its walls, its ductwork if it has any, matters more than matching the old system's size. Get that step done before the unit is picked, not after.
The outdoor unit and air handler are just part of what gets paid for. Setting the line set, wiring the disconnect, running condensate drainage, and getting the system commissioned takes a crew a full day or more. That labor costs the same whether the unit is a basic model or a loaded one.
Undersized ductwork, a panel that can't take the new circuit without an upgrade, a condenser pad that needs pouring, all of that adds work before the heat pump even goes in. A straightforward swap, where the old system's bones still fit, costs less than a job where something underneath has to be brought up to code first.
If the old system is a furnace paired with an air conditioner, both usually come out. The heat pump and its air handler take over the jobs they used to split. When the gas furnace comes out, that gas line gets capped off properly. It doesn't get left charged behind a wall. The old condenser gets disconnected and hauled off. The pad underneath it either gets reused or broken up, depending on its condition. Indoors, the old air handler or furnace comes out of its closet or basement spot. The new one goes in that same place, as long as the ductwork connections still line up for it. Any refrigerant left in the old line set gets recovered. It never gets vented, since that's wasteful and against the law. If the existing ductwork is staying instead of getting replaced, it gets checked for leaks and loose connections first, before the new system ever pushes air through it.
The outdoor unit goes on its pad first, then the line set runs to the indoor air handler. Refrigerant lines get connected and pressure tested before any charge goes in. The electrical disconnect gets wired up. If the panel needs a new circuit for the heat pump, that gets pulled and tied in too. Once it's all connected, the system gets charged to the exact weight the manufacturer calls for, not just topped off by feel. Then airflow gets checked at the registers, the thermostat gets confirmed talking to the system right, and it runs through both heating and cooling before anyone leaves. A straightforward swap wraps in a day. Duct repairs, a panel upgrade, a new condenser pad, any of that adds time, because it has to happen before the heat pump goes in.
